AWARD WINNING: ANGIE’S LIST SUPER SERVICE AWARD (14 YEARS CONSECUTIVE)

In Suffolk County your building permit comes from your town or, if you live inside an incorporated village, from your village. But Suffolk differs from Nassau in one way that catches homeowners out: the Suffolk County Department of Health Services may also have to approve your project — and on a property with a septic system, that approval can decide whether the job is possible at all.

That second approval is the part nobody warns you about. A dormer that adds a bedroom, or a bathroom addition that moves a waste line, can require county sign-off on top of your town permit. Homeowners find out late, and late is expensive.

Verified September 2026 against the Towns of Babylon, Islip and Huntington and the Suffolk County Sanitary Code. Codes and contacts change — confirm current requirements before relying on this page.

Who Issues What

Approval Who grants it
Building permit Your town, or your village if you are inside one
Sanitary / septic approval Suffolk County Department of Health Services, Office of Wastewater Management
Plumbing and electrical certificates Town-approved inspection agencies, filed alongside the permit

The two tracks run in parallel. The town will not close out your job without the county piece where the county piece is required.

The Suffolk Difference: When the County Has to Approve Your Renovation

Much of Suffolk County is unsewered. Where a property is on a septic system, Article 6 of the Suffolk County Sanitary Code governs, and it is written in terms most homeowners never encounter until they are already mid-project.

“No Developer or Property Owner shall … engage in the creation of a New or Expanded Single-Family Residence … unless prior Department approval has been obtained for the existing or proposed water supply and Sewage disposal facilities.”

— Suffolk County Sanitary Code, §760-604(A)(3)

Everything turns on what counts as an “Expanded Single-Family Residence.” The Code defines it at §760-603, and the definition is broader than people expect. It includes:

Read that last one twice. It is not about square footage or cost. If your project adds a bedroom and pushes you past the bedroom count the county has on file for your septic system, you need county approval — even though the bedroom itself has nothing to do with plumbing.

That is precisely what a dormer or an attic conversion does. It is the single most common way a straightforward Suffolk renovation turns into a sanitary review.

Touching the septic system itself

“After July 1, 2019 … no Property Owner, contractor, or Developer shall engage in an OWTS Replacement or an OWTS Retrofit of an existing Cesspool or Individual Sewerage System for any permanent structure unless Department approval is obtained.”

— Suffolk County Sanitary Code, §760-605(B)(1)

“Retrofit” is defined broadly. Replacing or adding a septic tank, adding leaching structures, or re-configuring system piping all count. Parcels inside an approved proposed sewer district are excluded.

Office of Wastewater Management Division of Environmental Quality
360 Yaphank Avenue, Suite 2B, Yaphank, NY 11980
Phone 631-852-5800

If your home is on public sewer, none of this applies to you. Confirm which you are on before assuming either way — sewer coverage in western Suffolk is patchy and varies street by street.

The Three Western Suffolk Town Building Departments

If you are not inside an incorporated village, this is where your permit comes from.

Town Building Department Contact
Babylon 200 East Sunrise Highway
Lindenhurst, NY 11757
Mon–Fri, 9:00 a.m.–4:30 p.m.
631-957-3058
Online filing only since 2 February 2026
Islip Building Division
One Manitton Court, Islip, NY 11751
Mon–Fri, 8:00 a.m.–4:00 p.m.
Permits 631-224-5466
BuildingPermits@islipny.gov
Huntington Building & Housing, Town Hall
100 Main Street, Room 115
Huntington, NY 11743
631-351-3000
Online Permit Portal

Town-by-town notes worth knowing before you file

If You Live in an Incorporated Village

As in Nassau, villages run their own building departments with their own codes, inspectors and review boards. The town has no jurisdiction over your permit.

The incorporated villages in these three towns are:

Village requirements can be stricter than the town’s and stricter than people expect. Lloyd Harbor, for example, publishes a permit reference chart that extends to tree removal and vista cutting — and warns that failing to get the right approval can mean delays, stop-work orders, fines and added cost.

Village boundaries do not reliably match mailing addresses. Confirm which authority you are under before anything is filed.

What Happens If You Skip It

How We Handle Suffolk Permits

We are a licensed general contractor and have been building on Long Island since 1976. Permits are part of the job, not an extra you chase separately.

Suffolk County Permit Questions

Does Suffolk County issue building permits?

No. Your building permit comes from your town or, if you live inside an incorporated village, from your village. Suffolk County’s role is separate: the Department of Health Services approves water supply and sewage disposal facilities under Article 6 of the Suffolk County Sanitary Code, which matters on properties with septic systems.

Do I need a permit to remodel a kitchen in Suffolk County?

In almost all cases, yes. Towns and villages require permits for interior alterations, and work involving plumbing, electrical, gas or structure requires a permit and inspections. Purely cosmetic work such as painting or replacing cabinet doors generally does not.

Does Suffolk County have to approve my renovation if I am on septic?

It depends on what the project does. Under §760-604 of the Suffolk County Sanitary Code, prior Department approval is required for a New or Expanded Single-Family Residence. That includes any addition or modification requiring the addition or modification of sewage disposal facilities, and the addition of one or more bedrooms beyond the number previously approved by the Office of Wastewater Management.

Does adding a dormer require Suffolk County approval?

If the dormer adds a bedroom and takes you past the bedroom count the county has on file for your septic system, then county approval is required in addition to your town or village building permit. If it adds no bedroom and does not change sewage disposal facilities, generally it does not. Confirm with the Office of Wastewater Management at 631-852-5800.

Do I need county approval to replace my septic system?

Yes. Since 1 July 2019, no property owner or contractor may carry out an OWTS Replacement or OWTS Retrofit of an existing cesspool or individual sewerage system without Department approval. Retrofit is defined broadly and includes replacing or adding a septic tank, adding leaching structures, or re-configuring system piping.

How do I file a building permit in the Town of Babylon?

Online only. Since 2 February 2026 all Town of Babylon applications and supporting materials must be submitted through the Town’s Online Permit Center.

Planning a Renovation in Western Suffolk?

We handle the permit process as part of the project — the right authority, and the county sanitary question answered before it becomes a problem. Free consultation and a written line-item estimate.

516-826-8054 · Licensed Nassau County #184594 · BBB A+ since 1991 · 14× Angi Super Service Award