Great Neck is an incorporated village with its own building department. Permits for work here are issued by the Village of Great Neck — not by the Town of North Hempstead and not by Nassau County. Any new structure, alteration, or sign requires a village permit, and the village also issues permits to the landscapers and plumbers who work here.

That distinction catches homeowners out constantly. A contractor who files with the wrong authority loses weeks.

Great Neck is unusual in publishing the cost of board review up front, and it is not small:

“The required initial deposit for Zoning Board of Appeals and Planning Board site plan applications is $2,500 in escrow.”

— Village of Great Neck Building Department

That is money committed before a single decision is made. On a project that can avoid board review, avoiding it is worth real money — which is why the zoning question needs answering before the application goes in, not after.

Verified September 2026 against the Village of Great Neck Building Department. Village codes change — confirm current requirements with the village before relying on this page.

Do You Need a Permit in Great Neck?

The Village of Great Neck Building Department issues permits for:

For a kitchen or bathroom renovation, the practical answer is nearly always yes. Anything touching plumbing, electrical, or structure requires a permit and inspection.

Village of Great Neck Building Department — Contact and Hours

Address 767 Middle Neck Road, Great Neck, NY 11024
Phone 516-482-2000
Hours Monday–Friday, 8:30 a.m. to 4:30 p.m.
Website greatneckvillage.org — Building Department

Boards That Can Affect Your Project

Great Neck projects may require review beyond the building department itself:

Each meets on its own schedule. This is where Great Neck timelines are won or lost. A project that needs board review and misses a filing deadline waits for the next meeting — and that delay is invisible until it has already happened.

Requirements Vary by Zone

The village is explicit that requirements differ by zoning district and directs applicants to the Zoning Map to find the code requirement for their specific zone. Two houses on the same street can face different setback, coverage, and height rules.

The Building Department is led by Michael Sweeney, Superintendent of Buildings. The village maintains separate secretaries for the Planning Board, the Zoning Board of Appeals, and the Architectural Review Committee — a sign of how much project traffic runs through board review here.

How We Handle Great Neck Permits

We are a licensed general contractor (Nassau County Home Improvement License #184594) and have been building on Long Island since 1976. We file permits as part of the job — not as an extra you chase separately.

What that means on a Great Neck project:

Great Neck Permit Questions

Does Great Neck issue its own building permits?

Yes. Great Neck is an incorporated village with its own building department at 767 Middle Neck Road, Great Neck, NY 11024. Permits are issued by the village, not by the Town of North Hempstead or Nassau County.

Do I need a permit to remodel a kitchen or bathroom in Great Neck?

In nearly all cases, yes. The village requires permits for interior and exterior alterations. Work involving plumbing, electrical, or structural changes requires a permit and inspections.

Does Great Neck charge for board review?

Yes. The village requires an initial deposit of $2,500 in escrow for Zoning Board of Appeals and Planning Board site plan applications. Confirm the current figure and what it covers with the Building Department before filing.

What happens if work is done without a permit in Great Neck?

Unpermitted work can result in stop-work orders, fines, and difficulty obtaining a certificate of occupancy. It also commonly surfaces at resale, when a title or municipal search reveals open or absent permits.

How long does a Great Neck building permit take?

Timelines depend on scope and whether the project requires board review, which is scheduled by meeting calendar and is typically the largest variable. Contact the Building Department at 516-482-2000 for current processing times.

Planning a Renovation in Great Neck?

We handle the permit process as part of the project. Free consultation, and a written line-item estimate.

516-826-8054 · Licensed Nassau County #184594 · BBB A+ since 1991 · 14× Angi Super Service Award